CVS Health new standby power system
During the Summer of 2017 EVAPAR completed the commissioning of a new standby power system at CVS Health in Louisville, KY as part of a $25 million dollar expansion of their distribution center. The expansion of the supply-chain logistic facility in Louisville was done to meet future customer demands and to fulfill a commitment to connect patients with needed therapies. The system includes four (4) Diesel powered Generac Power Systems 2MW units, for a total of 8MW of on-site back-up power, along with some ASCO transfer switches.